Sinks and Doors and Restoration, Oh My.

Image

So it’s been quite the interval since our last blog post, but in the interim quite a great amount has happened. We’ve finally obtained the final draft of the plans (using the correct building material – a polystyrene-concrete block that my significant other will doubtlessly write up shortly) and all that’s left is for the builder to obtain permits and begin.

That said, it’s high time. We’ve been collecting bits and pieces of the house since we settled on the idea of constructing. Needless to say, there’s no excess room in the condo to store the makings of a new house – the flotsam and jetsom of our imagined creativity, which will hopefully someday form a cohesive whole. Sometimes the list of projects seems overwhelming, but the idea of each jigsaw piece falling into place makes the process worthwhile. To date, we’ve collected a pot filler (at my instigation), a kitchen faucet to match, 2 ceiling fans, 2 bathroom faucets, a sink, a front door, and some random glass fixtures or fixtures-to-be, pending the level of our dedication to uniqueness. Add to this every piece of dinnerware waiting for a shelf to live on, every piece of art waiting for a wall on which to hang, and… well, you can start to imagine what the “craft room” of our current residence looks like.

The front door and the sink are special projects. I say special, my significant other may choose other vocabulary. These are items which (again, on account of those visions of perfection dancing in my head) we’ve purchased in what you might call a raw state. Because, you know, we’re fixer-uppers par excellence. Or hope to be.

The door we purchased from a fantastic establishment called the Old Door Store, near the junction of Blanco and Hildebrand. We found out that though the sign suggests that the store is open 10:30 AM to 5:00 PM Monday through Saturday, appointments are also available. This also prevents one from running into other pesky shoppers while perusing the aisles of… old doors.

But the nice part about old door hunting is that it turned out to have been something that my love and I could agree on. Now that may sound unspectacular, but there are surprisingly few things about which there hasn’t yet been a protracted (and sometimes unresolved) conversation (my word – his would be dispute). Seeing the old doors in their antique and unfinished, freshly-salvaged states, however, was able to simmer the creative juices in both of us, however, and we generally agreed on the styles of door we preferred. We had both agreed that, as the front door would be our future guests’ first experience of the home, it should be a door that added some individuality – something that reflected our style, not simply a builder-grade mass-produced door. I didn’t calculate cost into this aspiration.

After a considerable amount of deliberation (I should mention here that we had looked at doors elsewhere and been generally unimpressed) we settled on our 39” wide, craftsman-style door with 3 lights. The size, we presume, will add an appropriate grandeur, and the windows, while larger than those of other doors of this type, aren’t large enough to pose a real security risk or compromise our privacy.

After deciding that this was the door we’d adopt (and rushing to the nearest ATM while the kind owner of the Old Door Store, Mr. Raetzsch, waited patiently for us), we gingerly loaded it into the back of my truck and proudly drove away. Not far away – to have a drink with some friends at Barbaro, on McCullough. All the while praying and crossing our fingers that no passing door-thief would see the not-insignificantly-priced opportunity waiting in the back of my truck, which I had oh-so-purposefully backed into a parking space, so as not to make our goods evident.

The door survived, and we kept it in the “craft room” (again, my name, not his) of our condo until we decided to crack the proverbial eggs and start working on our omelette.

The sink, which was stored for a month or two in the back seat of my pickup rather than the “craft room” (at my love’s insistence), was similarly purchased. Now, we easily agreed that we ought to have a front door with character. The sink was a harder sell. It stemmed from my fear that a home made from entirely modern, builder’s grade (or better) fixtures would end up looking rather like any cookie-cutter box of a home in some development in outer suburbia. (You know the type. They all look exactly the same from the outside and -let’s face it – also from the inside.) Thus my decision that we ought to use as many re-purposed, re-finished, re-used, or up-cycled finishes as possible. But that will come later, perhaps.

The sink we found at a lovely shop in Dignowity called Architectural Antiques. Now not everything sold there changes hands at rock-bottom prices. This I admit, but there are many, many things to be said for this lovely store. They offer the service of re-finishing doors bought elsewhere, have many unique pieces, and offer a store owner with a fantastic amount of expertise. Mrs. Rusler, I believe, seemed to know impossible details about the finishings she offered when I struck up a conversation while browsing after school one day. (Yes, I went shopping for antique hardware after school one day. It’s my joy.) “Those hinges, the strap kind, never really caught on in the South. They come from up North. These things in this case were window pulls for double-hung windows, but now people use them for pocket doors because they mount flush.” Details I’d never have either known or thought to ask about.

Anyhow, my love capitulated to my idea that the downstairs half-bath should have a vintage sink. I offered to do the refinishing myself, since I’d priced professional refinishers and wasn’t willing to spend $275 on one sink, which wasn’t even mounted yet. (This price was quoted to me several times.) So we found the perfect sink – a wall-mounted cast-iron gem (in my eyes) with a bit of rust around the drain and a considerable amount at the overflow holes. The professionals had advised that these would have to be closed up, as attempting to refinish the sink without doing so would just allow the rust to creep back in a few years. I’m far too perfectionistic for that.

Thus, with these two projects in tow, we took over my parents’ lovely backyard for one day of our spring break staycation. The refinishing will come in a later post.

As for our sourcing:

Advertisements

Signing my life away.. Construction financing!

So, we have great plans and an awesome builder. Now we just have to find a way to pay for it. I’m a total finance geek, so this has been kind of fun for me and I figured I might as well share my experience in case someone else is going through this.

I actively started looking at options about 6 months ago and started narrowing it down late last year. Let me start off with a little bit of background on construction financing in general. There are really two types of residential construction loans. 1x Close and 2x Close. There are pros and cons to both, I decided to go with the 1x Close option. Here’s what I see as the pros and cons:

1x Close–you have one loan the whole time, usually you pay a higher rate, but you are locked in

  • Pros: Only pay one set of closing costs, if interests rates rise during construction you are already locked, no worry about getting approved for a second loan
  • Cons: Can take longer to close initially, stuck with the higher initial interest rate, less banks do this (less competition)

2x Close–you actually have two loans, one interim loan for during the construction and then a second permanent loan that pays off the first one (the second loan is really just a “normal” loan)

  • Pros: More banks do this, if interest rates stay the same or get lower you get lower interest rates long term, typically shorter close times
  • Cons: Pay closing costs twice, interest rates can go up during construction, could be in a bad situation if house doesn’t appraise or you have approval problems

I’m pretty worried about interest rates rising in the next year, so I was already leaning towards a 1x Close. When I started my research I also found a bank that offers a “float down” option and a 1x Close. They do this by charging a quarter point penalty if you exercise the float down. So here’s how it could work, all these numbers are theoretical. Let’s say I started the loan with a 5% interest rate. No matter what the max rate I will have over the life of the mortgage is 5%. If, by the time the house is completed the prevailing interest rate is 6%, nothing happens, I still have the 5% rate. If the rate is at 4.75%, I still would do anything because with the .25% penalty I’d still have a 5% rate. However, if the rate drops below 4.75% I could decide to float down to the current rate plus .25%. I’m pretty excited by this because I feel like it’s kind of getting the best of both worlds. The only drawback to this bank is that it takes slightly longer to close than some of the other 1 and 2x Close options.

Here’s some things I learned while going through this process:

  1. There aren’t that many banks that do construction financing–make sure to include looking at local banks they are more likely to do it
  2. The financing for construction lending is more restrictive than regular financing because it is more risky
  3. The lender has to approve you and the builder, so make sure you pick a builder that can get approved
  4. Ask for Good Faith Estimates (GFEs) when comparing the loan options, it can really help you compare the different fees and costs between builders
  5. Lenders are crazy different when it comes to construction financing, almost all require 20% down, which is what I was planning on doing anyway, but some require 40% down with a 10% cash contingency (wow)
  6. You’ll need to have a signed contract from a builder to start the application process but you will definitely want to do your research before this as usually the builder will require you to apply within a short time after the contract is signed so you don’t want to limit your research time by waiting until the contract is signed

We signed a contract!

We officially have a builder now and decided to go with the Eterna Building System! I’m really excited about both of these developments.

First, the builder.. We decided to go with Greenboro Homes who have really been great so far. Throughout the entire bidding process, Jim Leonard was great. He really helped me understand the different choices and options and put a lot of time and effort into presenting them all to me. Another great part is that he’s willing to work with us on some of the things we want to do with the project. For example, we wanted to use Ikea cabinets and Mike’s brother is going to help with the AC. The biggest selling point, though, was the fact that he really invested in understanding and working with the alternative materials. Speaking of..

The Eterna Building System! From the very beginning, I’ve been very interested in green building materials. I was really excited when a local engineering company suggested we look into these. They sounded really great from the very beginning with the biggest downside being the cost, which initially came in WAY above 2×6 construction. However, we were able to negotiate that down a bit. It’s still quite a bit above with 2×6 construction costs, but it was really something I wanted to do so I’m excited to say we’re going with them. In addition to the blocks we’re planning on doing some other “green” things with the house. We’re using a mini-split AC system, prewiring for solar, using high efficiency appliances, and thinking about a rain water catchment system for the lawn.

So, what’s next? Financing. I started that process and expect it to take about two months. I’ll talk more about that process in the next installment.

Link

Bids in and the Eterna Building System

Bids in and the Eterna Building System

So the bids are coming in! I asked 3 builders/general contractors to bid out the project based on architectural drawings we finalized a few weeks ago. As you probably know, I’m a bit obsessed with green building materials and really wanted to go with something other than stick construction. I was very interested in Cresco Concrete products but couldn’t find a builder and structural engineer to work with them for a reasonable amount. I did find a similar product though.. the Eterna blocks. A local engineering firm has worked with them before and has a concrete person who builds exclusively with the blocks. I’ve gotten the bid in for 2×6 R19 construction from all three builders. I’ve gotten 1 bid in for the block system and hoping for another early this week. From talking to the engineer and concrete person, the pricing is somewhat competitive so I’m interested to see what it really comes out to. None of the builders seem too interested to work with them (mostly because they are unfamiliar) but I like them for a couple of reasons.. Insulation (for heating/cooling reasons and sound), they don’t really burn, resistance to termites, and ease of applying stucco. The big downsides are cost, lack of options for people who work with it, and lack of general information available.

Hopefully there will be more news coming soon!